![]() ![]() Monitored drill-string torque/drag and optimized drilling parameters to maximize drilling rate with oil-based, water-based and under-balanced air / nitrogen foam-injection systems. Executed cased and open-hole whip-stock placement and orientation for effective well bore kick-off and side-tracks.Completed many CBM horizontal natural gas wells. Completed slim-hole re-entries with gyro and steering-tool orientation. Efficiently drilled conventional and horizontal directional, including ERD, well profiles with TVDs in excess of 10,000' and build rates ranging from 2 deg./100' to 45 deg./100'.Ensured all equipment was properly laid out after use according to company procedures and manifested for backload at the end of each job.Inspected, measured, and documented all directional related company equipment delivered to the work site and maintained records including dimensional data and condition.Prepared BHA performance reports containing detailed and accurate dimensions as well as expected versus actual performance, conclusions, and recommendations for each BHA run.Applied principles of BHA selection and aspects of Directional Drilling performance to ensure BHA's were assembled safely and as planned including correct make-up torque, doping and handling.Collaborated with the Measurement While Drilling engineer to ensure BHA compatibility and correct tool face references.Prepared Directional Drilling reports, BHA performance reports, Anti-Collision reports, service tickets and relevant paperwork.Utilized Directional Drilling computer software to provide survey calculations and well path projections to the client representative.Accurately applied calculations using drilling surveys and Geologist feedback to land curve and drill lateral sections per customer expectations. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |